EasyManua.ls Logo

Noritz NCC199CDV - Making Piping Connections

Noritz NCC199CDV
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
48
CR60-IM.v0429.4
Making Piping Connections
Once water flow and gas supply direction is determined, the opposite end of the supply manifold must be
capped and checked for leaks.
End caps shall be field supplied and be of the following materials:
• Cold water line cap - Copper
• Hot water line cap - Copper
• Gas line cap - Black iron
• Condensate line - PVC
IMPORTANT: Cold water connection is located on the front side of the CR60 (for back to back models)
designated starting from unit #1. Do not connect the hot water supply line to this side.
Wall Hanging Unit Piping
Connection Orientation
Floor Standing Unit Piping
Connection Orientation