EasyManua.ls Logo

Noritz NCC199CDV - Securing Commercial Water Heating System Wall Mount

Noritz NCC199CDV
65 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40
CR60-IM.v0429.4
Securing Commercial Water Heating System Wall Mount
• Before mounting the CR60 to the wall, make sure the wall is capable of supporting the fully assembled
weight of the CR60.
• Consult a structural engineer for appropriate methods or structural analysis before attempting to wall
mount the fully assembled CR60.
• Failure to comply with the above requirements could result in substantial property damage, personal
injuries or death.
General Instructions for Mounting All CR60 Wall Hanging Racks
• Identify the installation location and confirm that the installation will meet all required clearances.
• There are no pre-drilled holes in the CR60 frame. Refer to the below for proper fastening instructions:
1. Identify fastening points (i.e. stud) at a maximum 18 in. apart.
2. Drill 5/16” clearance holes through the top frame of the CR60 rack corresponding to each
fastening location
3. Use ¼” x 2 ½” Wood Lag Bolts along with a ¼” flat washer (Field Supplied)
4. Tighten lag bolts
Commercial Water Heating System Wall Mount Models
• The minimum number of fastening points shall be:
Model
Number of
Fasteners Required
CR60-WH-2
8
CR60-WH-3
12
CR60-WH-2
CR60-WH-3