EasyManua.ls Logo

Noritz NCC199CDV - Initial Setup and Operation; First-Time Startup Procedure

Noritz NCC199CDV
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Before the first use, do the following:
Initial Operation
Initial Operation
Do not touch the power cord with wet
hands.
WARNING
1. Open the water supply valve.
CLOSED
OPEN
2. Open a hot water fixture/faucet to confirm
that water is available, and then close the
fixture/faucet again.
Hot water
fixture/faucet
3. Open the gas supply valve.
4. Turn on the power.

Other manuals for Noritz NCC199CDV

Related product manuals