Do you have a question about the NPK GH12 and is the answer not in the manual?
Defines DANGER, WARNING, CAUTION, and ATTENTION safety notice levels.
Details about NPK safety and operating decals and their placement.
Crucial safety instructions regarding flying debris and tool sharpening methods.
Important safety instructions for operation, gas handling, and parts usage.
Outlines the manual's content for operating and maintaining NPK Hydraulic Hammers.
Emphasizes using only genuine NPK parts for repairs and replacements.
Provides recommended carrier weight ranges for different NPK hammer models.
Warns about the dangers of mismatched hammer and carrier weights.
Details impact energy, frequency, weight, and tool dimensions for NPK hammers.
Lists oil flow, operating pressure, relief pressure, and gas charge for NPK hammers.
Illustrates and describes the location of the serial number on NPK hammers.
Explains the typical routing of hydraulic pressure and return lines.
Describes the two types of control systems used for NPK hammers.
Details critical steps to prevent contamination in the hydraulic system.
Guides on changing filter elements and hydraulic oil for optimal performance.
Advises on the use and precautions for hydraulic quick disconnects.
Details precautions for inspecting and using hydraulic quick disconnects.
Lists and illustrates the parts included in NPK mounting installation kits.
Provides step-by-step instructions for attaching the hammer to the carrier.
Details the safe procedure for detaching the hammer from the carrier.
Step-by-step guide for manually greasing NPK hammers.
Explains how to determine grease intervals.
Details the correct grease to use.
Lists manufacturers and brand names of recommended greases for NPK hammers.
Details NPK's specific grease formulations and part numbers.
Introduces the automatic greasing system for reduced wear.
Details the mandatory steps to prime the autolube grease line before use.
Continues the pre-filling procedure for the autolube system, including pumping and connection.
Identifies and describes parts used in the autolube grease line pre-filling assembly.
Defines key terms related to lubricants and their properties.
Defines additional terms like Reservoir, Vibration, and Viscosity.
Outlines the procedure for starting new, rebuilt, or inactive hammers.
Details pre-operation inspections.
Details the daily start-up procedure.
Provides critical safety guidelines for operating the hydraulic hammer.
Offers key techniques and precautions for efficient hammer operation.
Advises on aligning force direction and avoiding hammering at an angle.
Warns against using the hammer as a pry bar or hammering in one spot too long.
Lists additional cautions regarding dropping, moving objects, and cylinder stroke limits.
Details restrictions for underwater use, hot tool submersion, and boom contact.
Explains how hydraulic power is converted to kinetic energy and transmitted via stress waves.
Describes how compression and tensile waves behave at the tool's contact point.
Lists key areas for visual inspection, including fasteners, welds, hoses, and hydraulic oil.
Details demolition tool lubrication and checking tool/bushing wear.
Lists items for weekly inspection, including welds, retaining pin, tool, and gas charge.
Describes Chisel, Moil, and Blunt tools and their applications.
Describes the Core tool and its applications.
Explains how to identify NPK demolition tools using stamped numbers and photos.
Provides step-by-step instructions for removing and reinstalling the demolition tool.
Guides on measuring tool-to-bushing gap and tool diameter for wear.
Details measuring bushing inside diameter and criteria for replacement.
Provides dimensions and procedures for resharpening chisel tools.
Lists dimensions for NPK tools, including diameter, total length, and working length.
Guides on inspecting the tool retaining pin for wear and damage.
Details inspecting tools for deformation, chipping, and retaining pin issues.
Outlines the 30-day warranty for demolition and accessory tools.
Defines user duties and NPK's responsibilities under the tool warranty.
Details common causes of tool failure and specific exclusions from warranty.
Analyzes tool breakage caused by bending, its characteristics, and prevention.
Explains how worn bushings lead to tool breakage and damage.
Advises on replacing tool holder bushings to prevent breakage.
Details chipping and deformation of tools at the retaining pin slot.
Explains how continuous hammering in one spot can deform the tool tip.
Covers chipping on moil and chisel tips due to application or overheating.
Discusses issues caused by low or high temperatures and excessive slant hammering.
Explains how corrosion and defective material can cause tool breakage.
Lists torque values for socket head cap screws in various hammer components.
Lists torque values for hex head bolts used in hammer brackets and mounts.
Specifies torque values for hammer bracket bolts, noting reductions in L2.
Details nitrogen gas pressure requirements at ambient and operating temperatures.
Lists the parts included in the NPK gas charging kit.
Step-by-step guide to check the nitrogen gas pressure in the hammer.
Details finishing the gas pressure check and comparing readings.
Step-by-step guide for charging the hammer with nitrogen gas.
Details the final steps for removing the adapter and replacing the cap after charging.
Step-by-step guide for safely discharging nitrogen gas pressure from the hammer.
Provides instructions for registering new NPK units via mail, fax, or online.
Details recommended steps for storing the hydraulic hammer for short and long terms.
Outlines the 3-year limited warranty for boom mounted hydraulic hammers.
Details responsibilities, exclusions, and limitations for NPK warranties.
Covers the 90-day warranty for NPK replacement parts.
Details the base and extended warranty for NPK Autolube systems.
Provides fields for recording hammer, kit, and carrier information, and inspection dates.
Loading...