. Commissioning
CPA-E and CPA-E S PWM series
.. Before commissioning
Ensure that the system is filled and the minimum inlet pressure
is applied before you switch on the pump (for more information
please see Chapter ).
.. Bleeding the pump
CPA-E circulation pumps are equipped
with a self-bleeding function. It is not
necessary to bleed the pump before
commissioning. Air in the pump can
generate noises. As a remedy, switch
to operating mode III for a short period
of time. The noises will stop after
bleeding. Ensure that the pump is reset
to the required operating mode (see
Chapter ).
The Pump must not run dry.