Summary

Imballaggio, Trasporto e Stoccaggio

Packing, Lifting, and Handling

Operations for packing, lifting, handling, transporting, and unpacking must be performed by experienced personnel.

Storage and Stacking of Packs

Guidelines for storing packs in covered areas and precautions for stacking them safely.

Introduzione e Manuale

Opening and Disposal of Packaging

Instructions for safely opening packs and disposing of packing materials.

Introduction and Warnings

Important information for workshop personnel regarding safety and lift operation.

Keeping the Manual

The manual is an integral part of the lift and must always be kept with it.

Descrizione della Macchina

Fixed Structure Assembly

Details on the fixed structure, including posts, safety rods, and cables.

Movable Structure Assembly

Components of the movable structure, including cross-pieces and platforms.

Specifiche Tecniche

Capacity and Dimensions

Technical specifications including lifting capacity, height, and clearance dimensions.

Vehicle Specifications

Maximum dimensions and weights of vehicles suitable for lifting.

Components Specifications

Detailed specifications for the motor, pump, and lifting cables.

Sicurezza

General Precautions

Essential safety rules, warnings, and forbidden uses of the lift.

Rischi Durante il Sollevamento

Potential risks and safety devices during the lifting phase.

Rischi per le Persone e Veicoli

Risks to personnel and vehicles, including crushing, impact, and falling hazards.

Altri Rischi di Sicurezza

Risks related to slipping, electric shock, lighting, component failure, and improper use.

Installazione

Installation Requirements

Checks for suitability of the location, dimensions, and safety clearances.

Lighting and Floor Requirements

Guidelines for adequate lighting and floor preparation for installation.

Floor Preparation and Marking

Steps for marking the floor and preparing it for column placement.

Montaggio

Assembly of Movable Structure

Instructions for assembling the movable structure, including platforms and cross-pieces.

Column and Post Assembly

Steps for assembling the columns, control post, and hydraulic unit.

Hydraulic and Electrical Connections

Procedures for connecting the hydraulic system and electrical wiring.

Cable Pre-adjustment and Securing

Adjusting lifting cables and securing posts to the ground.

Ramp and Wheel Stop Installation

Instructions for fitting vehicle ramps and wheel stops.

Collaudi e Controlli Prima dellAvviamento

Mechanical Checks

Inspection of pulleys, alignment, bolts, moving parts, and protections.

Electrical and Hydraulic Checks

Verification of electrical connections, earth connection, and hydraulic system.

Motor Rotation Direction Check

Checking the motor's rotation direction against the pump's indicator.

Messa a Punto e Funzionamento

Set-up Procedures

Operations performed exclusively by technicians for initial setup and checks.

Operator Controls

Description of controls like main switch, lift, lowering, and stop buttons.

Operating Procedures

Step-by-step instructions for lifting, stopping, and lowering operations.

Manutenzione

Platform Maintenance

Ensuring longevity and good condition of platforms through regular care.

Maintenance Personnel and Safety

Requirements for expert personnel and safety precautions during maintenance.

Specific Maintenance Precautions

Warnings regarding electric shock and avoiding work on moving parts.

Optimal Maintenance Practices

Recommendations for using original parts, following intervals, and performing checks.

Manutenzione Periodica

Monthly Maintenance Schedule

Tasks to be performed monthly, including hydraulic unit and circuit checks.

Quarterly Maintenance Schedule

Tasks to be performed every three months, covering bolts, cables, and safety systems.

Semi-Annual Maintenance Schedule

Tasks for every six months, focusing on oil status and general inspection.

Annual Maintenance Schedule

Tasks for every twelve months, including electrical system and hydraulic oil replacement.

Inconvenienti e Rimedi

Troubleshooting Guide

A guide to identifying common problems and their corresponding solutions.

Informazioni Particolari e Ricambi

Disposal of Used Oil and Machine Scrapping

Procedures for disposing of used oil and scrapping the machine.

Spare Parts and Ordering Procedure

Information on obtaining spare parts and the procedure for ordering them.