EasyManua.ls Logo

Omicron Lab Bode 100 - Quick Check of Ac Coupling Capacitors at Input Channels 1 & 2

Omicron Lab Bode 100
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bode 100 - Information
Detailed Functional & Calibration Check of Bode 100
Page 18 of 21
Smart Measurement Solutions
Smart Measurement Solutions
®
1.9 Quick check of AC coupling capacitors at input channels 1 & 2
Measurement Setup:
Figure 39: DC-Block - measurement setup
Attention:
Make sure that the 50 Ohm termination of CH1 and CH2 are switched OFF before you
connect the DC voltage. Otherwise the inputs of the Bode 100 will be destroyed!
Please use a DC Voltage Supply with low ripple and noise to avoid overload caused by the ripple on
the DC voltage.
Equipment setup:
First, select the measurement type “Gain / Phase” and start a continuous measurement.
Figure 40: DC- Block measurement type
Afterwards, connect the 12 VDC and switch it on.
Expected Measurement result:
A short overload might appear when switching on the 12 VDC (up to 2 seconds).
No continuous OVERLOAD should occur.

Other manuals for Omicron Lab Bode 100

Related product manuals