EasyManua.ls Logo

Pakedge Device & Software WK-1-C - System Requirements; Hardware Installation; WK-1;WK-1-B Mounting Options

Default Icon
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10 11
WK-1-C installation with optional pre-construction bracket
Pre-construction bracket sold separately.
1. Place the pre-construction bracket against the bottom of the ceiling studs at the desired
mounting location.
2. Mark locations for mounting screws. Drill 1/16” pilot holes at marked locations. Secure
pre-construction bracket to ceiling studs using the provided hardware.
3. Install sheet rock over pre-construction bracket. Make note of where the cutout on the
pre-construction bracket is when installing the drywall.
4. Cut opening in sheet rock using the cutout on the pre-construction bracket as a guide.
Note: the Pakedge logo should be facing outwards.

Other manuals for Pakedge Device & Software WK-1-C

Related product manuals