Installation Instructions
Zone Control Box
Model No.
CZ-CAPZ1S
CZ-CAPZ1M
Safety Precautions
Please Read Before Starting
●This Zone Control Box must be installed by the sales dealer or installer.
This information is provided for use only by authorized.
● These instructions are all you need for most installation sites and main-
tenance conditions. If you require help for a special problem, contact our
sales/service outlet or your certifi ed dealer for additional instructions.
● We assume no responsibility for accidents or damages resulting from
methods other than those described in the Installation Instructions or meth-
ods using unspecifi ed parts. Malfunctions that occur due to unauthorised
installation methods are not covered by the product warranty.
● Zone Control Box must be installed in accordance with National Wiring Regulations.
●When relocating or repairing Zone Control Box, provide the Installation
Instructions to the servicing personnel.
● Please provide this Installation Instructions to the user after installation.
Instruct user to keep it in a safe place along with the air conditioner instruc-
tion manuals.
●The product meets the technical requirements of EN/IEC 61000-3-3.
●This product is intended for professional use.Permission from the power
supplier is required when installing the CZ-CAPZ1S , CZ-CAPZ1M that
is connected to a 16 A distribution network.
●Read the Installation Instructions supplied with indoor units and outdoor
units as well.
This symbol refers to a hazard or unsafe
practice which can result in severe
personal injury or death.
This symbol refers to a hazard or unsafe
practice which can result in personal injury
or product or property damage.
Prohibited matters
WARNING
Electrical shock can cause severe
personal injury or death.
Only a qualifi ed, experienced electrician
should attempt to wire this system.
Highly dangerous electrical voltages are used in
this system. Carefully refer to the wiring diagram
and these instructions when wiring. Improper
connections and inadequate grounding can cause
accidental injury or death.
Zone Control Box is strongly recommended to be
installed with Earth Leakage Circuit Breaker (ELCB) or
Residual Current Device (RCD). Otherwise, it may cause
electrical shock and fi re in case of equipment breakdown
or insulation breakdown.
Earth Leakage Circuit Breaker
(ELCB) must be incorporated in the fi xed wiring in
accordance with the wiring regulations.
The Earth
Leakage Circuit Breaker (ELCB) must be an approved
10 A, having a contact separation by 3 mm in all poles.
To reduce the risk of electric shock, smoke, or fi re, install
a circuit breaker and earth leakage protective device.
Turn off the circuit breaker of the units before
installation or servicing.
Provide a power outlet to be used exclusively for
Zone Control Box.
Do not supply power to the unit until all wiring is
completed or reconnected and checked.
To prevent possible hazards from insulation
failure, the unit must be grounded.
Do not set up in hospitals or places where
electronic medical devices are located.
Zone Control Box must be securely installed in
accordance with the Installation Instructions.
Use only the parts specifi ed by Panasonic as
supplied accessories.
Select an installation location which is rigid and
strong enough to support or hold Zone Control
Box, and select a location for easy maintenance.
No disassembly or modifi cation of this Zone
Control Box is allowed under any circumstances.
Electric work must be performed by authorised
personnel in accordance with the local
regulations and the instructions detailed in the
Installation Instructions.
Terminal block cover panel of the Zone Control
Box must be fi rmly fi xed. If the cover panel is
mounted improperly, dust and moisture may
enter the Zone Control Box, and it may cause
electric shock or fi re.
Do not operate with wet hands.
In case of an abnormal condition (such as a
burning smell),turn the breaker OFF.
When installing the Zone Control Box, use
appropriate protective equipment and tools for safety.
ヱㄏㄔㄐㄏㄊチヤㄐㄓㄑㄐㄓㄕㄊㄐㄏ
1006 Kadoma, Kadoma City, Osaka, Japan
ACXF60-43611
W0321-20921
https://eu.datanavi.ac.smartcloud.panasonic.com/documents/