Items
Adjustment
Point
Procedure Check
Repla
Part
(B
)
4.0V Supply
Confirmation
-
1. Confirm that the voltage between TP91 and GND is 4.0V ± 0.2V.
D4, C
Q9,
R41, R
C41
D5, C
C78
C69, C
C67
C76, I
(C
)
VBACK Status
Confirmation
-
1. Confirm that the voltage between J102 and GND is 0V ± 0.4V.
IC2,
C23
C24, C
C26
C27, C
R33
R36,
C41
R41, R
Q9,
C40,
R33
X1, C
C3
(D
)*
BBIC
Confirmation
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is
shown below.
IC2,
C32
C3
(E
)*
BBIC Clock
Adjustment
TP1
1. Execute the command "deactmac".
2. Execute the command "conttx".
3. Input Command “rdeeprom 00 00 02”, then you can confirm the current value.
4. Adjust the frequency of TP1 executing the command "setfreq 00 xx (where xx is
the value)" so that the reading of the frequency counter is 10.368000MHz ± 3Hz.
IC2, I
L1,
C48,
C32
C3
(F)
*
Hookswitch
Check with DC
Characteristics
-
1. Connect J1 (Telephone Socket) to Tel-simulator which is connected with 600 .
2. Set line voltage to 48V at on-hook condition and line current to 40mA at off-hook
condition of nomal telephone.
3. Execute the command "hookoff"
4. Confirm that the line current is 40mA ± 5mA.
5. Execute the command "hookon".
6. Confirm that the line current is 0mA + 2mA.
IC2,
R8,
R9, R1
R77
Q2, Q3,
C1,
38
www.freeservicemanuals.info
Digitized in Heiloo, Holland