Items
Adjustment
Point
Procedure Check
Repla
Part
(B
)
VBACK Status
Confirmation
-
1. Confirm that the voltage between TP18 and GND is 0V ± 0.4V.
IC1,
R21
R4, C
L2,
D1, C
C2,
C14,
R3,
R2, D
R22
C26, R
X1,
C16,
(C
)
BBIC
Confirmation
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is
shown below.
IC1,
C16
C1
(D
)
Charge Control
Check & Charge
Current Monitor
Confirmation
-
1. Apply 6V between TP5(+) and TP6(-) with current limit of PSU to 200mA.
2. Confirm that the charge current is ON/OFF.
3. SW to decrease current limit of PSU to 100mA.
4. Confirm that the charge current is stable.
IC1,
L4,
L5, Q2,
R6, D
R22
C26,
R21
R4, C
(E
)*
Charge
Detection (OFF)
Confirmation
-
1. Stop supplying 6V to TP5(+) and TP6(-).
2. Execute the command "charge".
3. Confirm that the returned value is 0x00 (hex).
IC1,
L4,
L5, Q2,
R6, D
R22
C26,
R21
R4, C
46
www.freeservicemanuals.info
Digitized in Heiloo, Holland