EN13EN12
Installation 1 Installation 2 Installation 3 Installation 4 Installation 5
Checking the Main Unit
and Supplied Accessories
TK-CJ600
Insert (replace) a Lithium
Battery into the Main Unit
Checking the Faucet
InstallingtheWaterPurier
The installation method
differs depending on the
shape of the faucet.
Checking after Installation
Run puried water for about
3 or 4 minutes to expel the
air inside the main unit, and
check for any malfunctions.
P. EN14 P. EN15 – EN16 P. EN17 – EN19 P. EN20 – EN26 P. EN27 – EN28
Steps to Take Before Operation
TK-CJ600_CJ300_EXZ.indb 12-13 2022/01/05 15:32:24