EasyManua.ls Logo

Panasonic S-200PE1E8 - Test Run Procedure

Panasonic S-200PE1E8
165 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
2-8
2-9. Test Run Procedure
Fig. 2-7
NO
YES
NO
YES
NO
YES
Recheck the items to check before the test run. (See 2-10)
Check the combination (wiring) of indoor and outdoor units. (See 2-15)
Is system “single-type”?
(1 indoor unit is connected
to 1 outdoor unit)
Are multiple outdoor
units used?
Turn ON the indoor and outdoor power.
Set the indoor unit control switch to “TEST”.
(Automatic Address Setting)
(See 2-12)
Can operation
be started?
Slide the indoor unit control switch back to “ON”.
(See 2-12)
Turn ON the indoor and
outdoor power
(Automatic Address setting)
(See 2-15-2)
In case of group control
Confirm wiring is done in
accordance with Fig. 2, “Basic Wiring”.
(See 2-15-3 to 2-15-6)
How to Set Automatic Address
Set the automatic address setting
from outside unit.
(See 2-14)
Refer to “Table of Self-Diagnostic Functions”
to check the system.
In addition, refer to 2-15 and correct any
items that need to be corrected.
Note: Check the indoor-
side drainage.
SM830194-00.indb8SM830194-00.indb8 2011/04/0619:12:472011/04/0619:12:47

Table of Contents

Other manuals for Panasonic S-200PE1E8

Related product manuals