86
20
Operation setup
Heat Water temp. for heating ON Compensation curve
Compensation
curve setup
21
Direct Direct temp. setup
Outdoor temp. for heating OFF
Heating OFF Temp. setup
22
∆T for heating ON ∆T for heating setup
23
Heater ON/OFF O/D temp for heater ON setup
Heater ON Delay Time
∆T of target temperature for Heater ON
24
∆T of target temperature for Heater OFF
Tank
Floor operation time (max.) Max. operation time for Heat & Cool mode setup
25
Tank heat up time (max.) Max. operation time for Tank mode setup
26
Tank re-heat temp. Tank re-heat temp. setup
27
Sterilization Sterilization day and temp. and time setup
28
Force DHW Temp. Force DHW temp. setup
29
Service setup
Pump maximum speed
Pump maximum speed setup Air purge
30
Dry concrete ON (Dry concrete)
31
Edit (Dry concrete schedule) Day and temp. setup
Service contact
Contact 1 Name and Tel No. setup
Contact 2
Name and Tel No. setup