EasyManua.ls Logo

Panasonic SA-PM08 - Operation Checks and Component Replacement; Checking Printed Circuit Boards (P.C.B.s)

Panasonic SA-PM08
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transmitter
8. Operation Checks and Component Replacement
Procedures
- This section describes procedures for checking the operation of
the major printed circuit boards and replacing the main
components.
- For reassembly after operation checks or replacement, reverse the
respective procedures. Special reassembly procedures are
described only when required.
8.1. Checking for the main P.C.B., power supply P.C.B. and system
control P.C.B.
8

Related product manuals