EasyManua.ls Logo

Panasonic VL-V524LCE - Page 54

Panasonic VL-V524LCE
102 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11.1.1.2When replacing BBIC and X'tal
Preparation:
1. PC setting refer to [8.1.1 Main Monitor Station].
2. Supply AC 230V.
Note:
Test points: Refer to [14.1.2 Main Board (Bottom View)].
No. Items Check Point Procedure
1 1.8 V Supply Adjustment CL437(BB1.8V)
1.
Confirm that the voltage between test point CL437 and CL109 (GND) is 1.8 V ±
0.02 V.
2.
Execute the command “VDD”, then check the current value.
3.
Adjust the 1.8V voltage of BB1.8V executing command “VDD XX” (XX is the
value).
2 3.3 V Supply Confirmation CL438(BB3.3V)
1.
Confirm that the voltage between test point CL438 and CL109(GND) is 3.3 V ±
0.2 V.
3 RF3.2 V Supply Confirmation CL436(RF3.2V)
1.
Confirm that the voltage between test point CL436 and CL109(GND) is 3.2 V ±
0.2 V.
4 BBIC Clock Adjustment CL402(BCLK)
1.
Confirm frequency between CL402 and CL109(GND).
2.
Input Command “sfr”, then you can confirm the current value.
3.
Check X’ tal Frequency. (10.368 MHz ± 100 Hz).
4.
If the frequency is not 10.368 MHz ± 100 Hz, adjust the frequency of CKM
executing the command “sfr xx xx” (where xx xx is the value: d) so that the
reading of the frequency counter is 10.368000 MHz ± 5 Hz.
- 54 -

Table of Contents

Related product manuals