2
Parker Autoclave Engineers
Instrumentation Products Division
Erie, PA USA
www.autoclave.com | Cat. 02-9221ME
Table of ConTenTs page
1.0 Safety and Operating Environment................................................................ 3
2.0 Initial Setup of Coning and Threading Machine ...................................................... 3
3.0 Tubing Preparation............................................................................ 4
4.0 Coning Operation ............................................................................. 4
5.0 Threading Operation........................................................................... 7
6.0 Assembly and Make Up ........................................................................10
7.0 Recommended Spare Parts .....................................................................12
8.0 Service .................................................................................12
FIGURES
1 Front and rear view of Coning and Threading Machine .......................................... 3
2 Determine Tube Length .................................................................. 4
3 Installing Coning Blades.................................................................. 5
4 Coning Blades: Part Number is facing out .................................................... 5
5 Proper alignment of Coning Blades ......................................................... 5
6 Illustration of Coning Operation ............................................................ 6
7 Tube End Dimensions.................................................................... 6
8 Moving die head to extreme position for chaser insertion by pressing head release lever ............... 8
9 Illustration of adjusting ring............................................................... 8
10 Positioning tube against tube stop. Die head is shown in the extremem open position .................. 9
11 Setting thread length. Die head is shown in the closed position ................................... 9
12 Assembly and Makeup of Connection .......................................................10
13 Completed Medium Pressure Connection ....................................................11
14 Completed High Pressure Connection .......................................................11
15 View of Pump Face......................................................................13
16 Pump/Reservoir Assembly................................................................13
TABLES
1 Extra Cutting Allowances for Engagement .................................................... 4
2 Required Feedwheel Rotation for Coning Operation............................................. 6
3 Tube Thread Dimensions ................................................................. 7
4 Torque Requirements for Coned Connection ..................................................11
5 Tooling Part Number ....................................................................12
Drawings and Schematics
Sheet 1 AEGCTM-2, 115 VAC, Views.............................................................14
Sheet 2 AEGCTM-2, Auxiliary Views & Parts List ...................................................15
Sheet 3 Oil Heater Option (AEGCTM-2WOH) & Alphabetical Parts List (AEGCTM-2) ........................16
Sheet 4 AEGCTM-2E-CE, 220 VAC, Views .........................................................17
Sheet 5 AEGCTM-2E-CE, Auxiliary Views & Parts List................................................18
Sheet 6 CE Oil Heater Option (AEGCTM-2EWOH) & Alphabetical Parts List (AEGCTM-2E-CE) .................19
Sheet 7 Oil Splash Guard Option (G) for all models..................................................20
Sheet 8 AEGCTM-2, 115 VAC, Wiring Diagram .....................................................21
Sheet 9 AEGCTM-2E-CE, 220 VAC, Wiring Diagram .................................................22
Supplemental Inserts (shipped separately with unit)
Little Giant
®
Pump Manual
Speed Reducer Manual
*Cutting Oil MSD Sheet
*Instructional Coning & Threading DVD, p/n P-9930-D
*Coning & Threading Tubing Gage
(*) Rental coning and threading machines will only receive these items.
Model # Order #
Serial # Mfg. Date
Drawing #