EasyManua.ls Logo

Paul FOCUS 200 Base - Commissioning and Handover Certificate

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
Commissioning and handover certificate 4.3
Customer data
Name:
First Name:
Tel:
Street:
Postal Code:
City:
Construction Projects:
Type of device:
Serial number:
Year of manufacture:
Completeness
No.
Parts
Design
Result
1
Supply air duct
- Design as planned
- There is an option to clean
yes / no
yes / no
2
Supply air duct passages
- Layout as planned
- Design as planned
- There is an option to clean
yes / no
yes / no
yes / no
3
overflow air passages
- Layout as planned
- Design as planned
yes / no
yes / no
4
Exhaust air passages
- Layout as planned
- Design as planned
- There is an option to clean
yes / no
yes / no
yes / no
5
Exhaust air line
- There is an option to clean
yes / no
6
Exhaust air ventilator
- There is an option to clean
yes / no
7
Control unit and control device
- functional
yes / no
8
Filter, optional
- Exchange or there is an option to
clean
yes / no
9
Heat exchanger for mechanical
ventilation heat
- There is an option to clean
yes / no
10
Documentation
- available
yes / no
Function
1
Operational at nominal ventilation,
as planned
Result OK.
Measure required
yes / no
yes / no
2
Switching stages is possible, as
planned
Result OK.
Measure required
yes / no
yes / no
3
Electrical power consumption
Result OK.
Measure required
yes / no
yes / no
Auditor’s Report
Date: ................................... Signature/Stamp:.......................................................................................
Start-up Personnel / Installer

Table of Contents

Other manuals for Paul FOCUS 200 Base

Related product manuals