Commissioning and handover certificate 4.3
- Design as planned
- There is an option to clean
- Layout as planned
- Design as planned
- There is an option to clean
yes / no
yes / no
yes / no
- Layout as planned
- Design as planned
- Layout as planned
- Design as planned
- There is an option to clean
yes / no
yes / no
yes / no
- There is an option to clean
- There is an option to clean
Control unit and control device
- Exchange or there is an option to
clean
Heat exchanger for mechanical
ventilation heat
- There is an option to clean
Operational at nominal ventilation,
as planned
Result OK.
Measure required
Switching stages is possible, as
planned
Result OK.
Measure required
Electrical power consumption
Result OK.
Measure required
Date: ................................... Signature/Stamp:.......................................................................................
Start-up Personnel / Installer