1
PG9YAA
Installation Instructions
95% SINGLE STAGE DIRECT OR
NON---DIRECT VENT GAS FURNACE
UPFLOW / HORIZONTAL
Special Venting Requirements for Installations in Canada
Installation in Canada must conform to the requirements of CSA
B149 code. Vent systems must be composed of pipe, fittings,
cements, and primers listed to ULC S636. The special vent
fittings and accessory concentric vent termination kits and
accessory external drain trap have been certified to ULC S636 for
use with those IPEX PVC vent components which have been
certified to this standard. In Canada, the primer and cement must
be of the same manufacturer as the vent system -- IPEX System
636, PVC/CPVC Primer, Purple Violet for Flue Gas Venting and
IPEX System 636, PVC Cement for Flue Gas Venting, rated
Class IIA, 65 deg C. must be used with this venting system -- d o
not mix primers and cements from one manufacturer with a vent
system from a different manufacturer. Follow the manufacturers
instructions in the use of primer and cement and never use primer
or cement beyond its expiration d ate.
The safe operation, as defined by ULC S636, of the vent system
is based on following these installation instructions, the vent
system manufacturers installation instructions, and proper use of
primer and cement. All fire stop and roof flashing used with this
system must be UL listed material. Acceptability under Canadian
standard CSA B149 is dependent upon full compliance with all
installation instructions. Under this standard, it is recommended
that the vent system be checked once a year by qualified service
personnel.
The authority having jurisdiction (gas inspection authority,
municipal building department, fire department, etc) should be
consulted before installation to determine the need to obtain a
permit.
Consignes spéciales pour l’installation de ventillation au Canada
L’installation faite au Canada doit se conformer aux exigences du
code CSA B149. Ce systême de ventillation doit se composer de
tuyaux, raccords, ciments et apprêts conformes au ULC S636. La
tuyauterie de ventillation des gaz, ses accessoires, le terminal
concentrique mural ainsi que l’ensemble du drain de condensat
extérieur ont été certifiés ULCS 636 pour l’application d es
composantes IPEX PVC qui sont certifiées à ce standard. Au
Canada l’apprêt et le ciment doivent être du même manufacturier
que le systême de ventillation -- IPEX Système 636, Apprêt
PVC/CPVC. Mauve Violette pour conduit en évacuation des gaz
et IPEX Système 636, ciment pour PVC pour conduit en
évacuation des gaz, évalué CLASSEIIA,65deg.C.doitre
utilisé avec ce systèeme d’évacuation -- ne pas mélanger l’apprêt
et le ciment d’un manufacturier avec le systême de ventillation
d’un autre manufacturier. Bien suivre les indications du
manufacturier lors de l’utilisation de l’apprêt et du ciment et ne
pas utiliser ceux--ci si la date d’expiration est atteinte.
L’opération sécuritaire, tel que définit par ULC S636, du système
de ventilation est basé sur les instructions d’installation suivantes,
ainsi que l’usage approprié de l’apprêt et ciment. Tout arrët feu et
solin de toit utilisés avec ce système doivent être des matériaux
listés UL. L’acceptation du standard Canadien CSA B419 est
directement relié à l’installation conforme aux instructions ci--
haut mentionnées. Le standard Canadien recommande l’
inspection par un personel qualifié et ce, une fois par année.
Les autoritées ayant juridiction (inspecteurs de gas, inspecteurs
en bâtiments, département des incendies, etc) devraient être
consultées avant l’installation afin de déterminer si un permis est
requis.
Question and Answer IconNeed help?

Do you have a question about the Payne PG9YAA048080 and is the answer not in the manual?

Summary

Special Venting Requirements for Installations in Canada

Required Notice for Massachusetts Installations

Carbon Monoxide Detector Installation

Requirements for installing CO detectors in homes with side wall vented gas equipment.

Safety Considerations

Safe Installation Requirements

Installation

Location and Clearances

Specifies required clearances around the furnace for installation and servicing.

Installation Requirements

Installation Positions

Furnace Installation Considerations

Condensate Trap and Drain Lines

Details on attaching and routing the condensate trap and drain line.

Vent and Combustion Air Connections

Guidelines for connecting vent and combustion air pipes to the furnace.

Combustion & Ventilation Air

Confined Space Installation

Indoor Combustion Air (Unconfined Space)

Venting and Combustion Air Check

Connecting Vent and Combustion Air Piping

Joining Pipe and Fittings

Procedures for joining vent and combustion air pipes and fittings.

Connecting Vent Pipes and Termination (Direct Vent)

Instructions for connecting vent pipes and terminations for direct vent systems.

Sizing Combustion Air and Vent Pipe

Vent Termination Clearances

Condensate Drain Trap

Upflow Installations Top Vent

Upflow Installations Vent through Left Side

All Models Vent through Right Side

Horizontal Left through Top

Horizontal Left-Side Vent

Horizontal Right through Top

Horizontal Right Side Vent

Vertical Termination

CONCENTRIC TERMINATION

Vent Termination Clearances

Specifies clearances for concentric vent termination locations.

Concentric Vent Termination - Kit # KGAVT0601 CVT & KGAVT051 CVT

Details on using concentric termination kits for furnaces.

GAS SUPPLY AND PIPING

Gas Piping Requirements

Rules and recommendations for installing gas supply piping.

Natural Gas Manifold Pressure

Propane Gas Manifold Pressure

Changing Orifices for High Altitude

ELECTRICAL WIRING

Power Supply Wiring

Guidelines for connecting the furnace's power supply and grounding.

Furnace Control

DUCTWORK AND FILTER

Installation

Procedures for installing ductwork and filters according to standards.

Sizing

Filters

CHECKS AND ADJUSTMENTS

Main Burner Flame Check

Temperature Rise Check

Changing Blower Speed

Separate Speed Selections for Heat, Cool, and Continuous Fan

FURNACE MAINTENANCE

SEQUENCE OF OPERATION & DIAGNOSTICS

Control Board Diagnostic Codes

Payne PG9YAA048080 Specifications

General IconGeneral
BrandPayne
Model NumberPG9YAA048080
TypeGas Furnace
Heating Capacity80, 000 BTU
Blower MotorMulti-Speed
Fuel TypeNatural Gas
AFUEUp to 96%
Heat ExchangerAluminized Steel
Ignition TypeHot Surface Ignition
Warranty10-Year Limited Warranty
BTU Input80, 000
StagesSingle-Stage