EasyManua.ls Logo

Peak Scientific NM20ZA - Unpacking and Installation

Peak Scientific NM20ZA
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Although Peak Scientific takes every precaution with safe transit and packaging, it is
advisable to fully inspect the unit for any sign of transit damage.
Check ‘SHOCK WATCH’ label for signs of rough handling prior to unpacking -
Unpacking and Installation
ANY DAMAGE SHOULD BE REPORTED IMMEDIATELY TO THE CARRIER AND
PEAK SCIENTIFIC OR THE DISTRIBUTOR FROM WHERE THE UNIT WAS
PURCHASED.
Follow the un-packing instructions posted on the side of the crate. It will require 2
people to lift the crate clear and to manoeuvre the generator onto the floor. Thereafter
the generator can be moved to its final location on the castors provided.
Note:- Included with generator is a pack containing , service filters & fittings. Be
careful not to discard these with the packing.
Please save the product packing for storage or future shipment of the
generator.
Unpacking and
Installation
High Purity Nitrogen Generator
UM NM20ZA Rev 13

Other manuals for Peak Scientific NM20ZA

Related product manuals