EasyManua.ls Logo

Peak 212 - Synchronization Cable Installation

Peak 212
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
I. Install cable
According to step E to choose the width distance of your lift (See Fig.14).
Note: Pass through the cable from the hole of the strength plate of one carriage to
another carriage.
1. For width distance with 3829mm (See Fig.20).
Pass through the cable from the
bottom to the top of two strength
plate of the carriages.
The strength plate of
carriage
70
70
Fig. 20

Related product manuals