2. BOILER SET-UP
1 Provide a sound, level foundation Locate boiler as
near to the chimney or outside wal! as possible and
centralized with respect to the heating system
2 Locate boiler in front of installation position before
removing crate
4 Separate the wood shipping pallet ff()m the boiler
base by removing two (2) hold down bolts at each
end of the boiler base
5. Move boiler into final position.