EasyManua.ls Logo

Pelpro PP130-B - Page 14

Pelpro PP130-B
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1445 North Hwy, Colville, WA 99114; 800-234-2508
Test Instruction Recommendations: PP130-B
Created on/by: 03/20/18; C. Winslow Howe HHT Design Engineer
Purpose: To create repeatability in test protocol of the stove.
Hopper Fuel: Hopper of the unit should be loaded up with a full 3 bags of fuel (Each bag weighing 40lb)
Test Settings: Unit should be set up using a 6in flue and 115VAC power source,
High: Dial should be set to 10 and the trim pot should be set to +4. When the unit is set and running at
this setting the light above the dial control will Flash 5 times with a pause between each sequence
Medium: Dial should be set to 3 and the trim pot should be set to +3 When the unit is set and running at
this setting the light above the dial control will flash 2 times with a pause between each sequence.
Low: Dial should be set to 1 and the trim pot should be set to 0. When the unit is set and running at this
setting the light above the dial control will flash once with a pause between each flash.
High
Medium
14 of 112

Related product manuals