FLECK 2900S Service Manual • 45
SYSTEM #6 & #7
Twin Series Regeneration Installation with a
Remote Meter
Twin Alternator Installation
NOTE: On System 7, the power cord is on Unit 2.
NOTE: System 7 can run with either one or two brine tanks.
Two brine tanks should be used if regeneration is less
than 4 hours.