EasyManua.ls Logo

Pentair IC60 - System Schematic Diagram; Feeder Installation Placement

Pentair IC60
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
IntelliChlor Electronic Chlorine Generator Installation and Users Guide
System Schematic Diagram
The following schematic diagram shows a typical IntelliChlor system installation.
Note: This schematic diagram is not drawn to scale. Refer to the relevant portions of this Installation
and Users Guide for information regarding proper placement and spacing of all equipment depicted in
this diagram.
NOT TO SCALE
Install Chlorine/Bromine Feeders after the IntelliChlor Cell
CAUTION - To avoid permanent damage to the IntelliChlor cell, automatic in-line chlorine/bromine feeders
(such as Pentair Water Pool and Spa
®
Rainbow models) MUST be installed AFTER the IntelliChlor cell as
shown below. When using the IntelliChlor with an in-floor cleaner pressure system, it is recommended that a
separate return line be used for the cleaner to reduce the increased water pressure stress on the IntelliChlor
cell.
Note: For best flow
sensing, provide at least
12"-18" of straight pipe in
front of the cell inlet.

Table of Contents

Related product manuals