EasyManua.ls Logo

Pentair LEGEND - Page 9

Pentair LEGEND
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LEGENDĀ® INSTALLATION MANUAL
E. Cutting the Feed Hose - (cont.)
3. Lay the telepole next to the clear (soft) hose. If
the clear (soft) hose is longer than the mark on
the telepole, cut the excess from the end attached
to the white (hard) hose. Do not cut off the float.
Leave the first float in position next to the
Back-Up Valve. Place the second float midway
between the first float and the Hose Swivel.
4. Attach feed hose to the wall fitting and attach wall
fitting to the pool wall. Hold the end of clear (soft)
hose and walk the perimeter of the pool keeping
the hose straight (do not stretch hose) to find the
farthest point of the pool from the wall fitting.
5. Measure the excess length between the farthest
point of the pool from Wall Fitting and the end of
30 in. clear (soft) hose.
6. Half of this measured length is to be cut
equally from 10 ft. white (hard) hoses next to
the Marked Swivel. (Example: Half of 6 ft. = 3 ft.
each). If you are cutting more than 2 ft. off the
hoses, remove the floats next to the Marked
Swivel from both hoses. See figures on page 4.
7. Re-assemble the hoses and the swivel using
mender nuts, see the Figure below. Put mender
nut on swivels first, then push hose over swivel,
rotate mender nut over hose clockwise until tight.
Note: Keep as many floats as possible on white
feed hoses spaced evenly apart to hold hose up
on top of water.
Water Level
White (Hard) Hoses
Swivel
Cut and Remove the
Excess Hose Length
Cut Clear (Soft) Hose Equal to
the Deepest Pool Water Level
Telepole / Clear (Soft) Hose
5
FEED
HOSE
MENDER
NUT
BARB ON SWIVEL
OR LEGEND
STEP 1
STEP 2
STEP 3
PUSH HOSE OVER BARB
PUSH MENDER NUT TOWARD HOSE AND ROTATE
CLOCKWISE BY HAND UNTIL TIGHT
SMALL END
OF MENDER
NUT AWAY
FROM HOSE

Related product manuals