EasyManua.ls Logo

Perkins 4006 - Page 50

Perkins 4006
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREVENTIVE MAINTENANCE
46 4006/8 Diesel, May 1998
SCHEDULE FOR ENGINES IN CONTINUOUS DUTY
The preventive maintenance operations must be applied at the interval (hours or months)
which occurs first.
A-Daily
B-Every 250 hours or 6 months
C-Every 2500 hours or 12 months
* By a person who has had the correct training.
A B C Operation
●
Check the coolant level
●
Check the lubricating oil level
●
Check the restriction indicators for the air filters and, when
necessary, renew the filter elements
●
Drain any water/sediment from the primary fuel filter
●
Check the condition and the tension of all drive belts
●
Check the specific gravity and the pH value of the coolant
●
Renew the lubricating oil and filter
●
Visually check for radiator air restriction
●
Clean centrifugal oil filter
●
Renew the canister of the main fuel filter
●
Clean the water trap sedimenter
●
Equalise bridge pieces and check valve clearances
●
Check that the air charge cooler and the radiator are clean and free
from debris
●
Drain and flush the coolant system and renew coolant mixture
●
Ensure that the fuel injectors are checked and corrected or
renewed, if necessary *