3
www.UsePhoenix.com • sales@UsePhoenix.comToll-Free 1-800-533-7533
Cabinet Divider
and Seals
Reactivation Air Outlet
Process Air Inlet
Heater
Process Air Outlet
Desiccant Wheel
Desiccant Wheel
Drive and Chain
3 Installation Instructions
Properinstallationofthisdehumidierisveryimportantfor
maximumserviceandperformance.Referto“Installation
InstructionsforthePhoenix1200Dehumidier”labelontop
ofmachineabovecontrolpanel.
3.1 Inspection
Thoroughlyinspectthedehumidierinsideandouttoinsure
thatnodamagehasoccurredduringshipping.(Ifanydamage
isfound,aclaimshouldbemadetotheshippingcompany
immediately).
3.2 Placing The Machine
Removeanyexternalpackagingorcrating.
Note: The supplied casters are stored in the process outlet
plenum for shipping. Remove and install casters prior to
operating machine. The dehumidifier should be carefully set
in place before connecting hose ducts.
3.3 Electrical
Alllocalandstatecodesmustbestrictlyadheredtoandgood
electricalpracticesshouldbefollowedtoachievethebest
installationpossible.Thesuppliedpowercordmusthavea
properplugorconnectionasrequired.Overloadprotection
shouldbesizedfor40amps@220/1/60.
(See Electrical Schematic drawing in the back of this manual
for internal wiring).
Thepowersupplyshouldbecheckedtobecertainthatthe
supplyvoltageagreeswiththeequipmentnameplate.Serious
damagetomotorsandcontrolscanoccurifincorrectvoltage
isapplied.
3.4 Duct Work
Theductworkrequirementsforthesesystemsaremuch
morecriticalthanconventionalairconditioningsystems.
ALLSUPPLYANDRETURNAIRDUCTHOSESFORTHE
DEHUMIDIFIERMUSTBEAIRANDVAPORTIGHT.Thisis
extremelyimportantforproperdehumidierperformance.
Eventhoughthedehumidierisremovingmoisture,itmay
notperformproperlyifmoistureentersthedryairstream
throughleaksintheductwork.Theairductsmustbeproperly
sizedtokeeppressurelossesataminimum,andprevent
thislossfromexceedingthedesignedfanstaticcapability.
Itisimportanttoinsurethatthereactivationdischarge
airdoesnotentertheprocessorreactivationinlets.See
“Specications”drawingforfanexternalstaticpressure.
4 Operating Instructions
Referto“InstallationInstructionsforPhoenix1200
Dehumidier”labelontopofmachineabovecontrolpanel.
ThePhoenix1200dehumidiercomescompletereadyfor
operation.Allthatisrequiredistoprovidetheproperpower
sourceandductconnections.
4.1 Airflow
Thedehumidierusestwodistinctairstreams.This
eliminatestherequirementto“balance”theairstreams.
4.2 Desiccant Wheel Rotation
Axedspeedgearmotor,timingpulley,andtimingbeltrotate
thedesiccantrotorattheproperspeed.Thebelttensionis
maintainedwithaspringloadedrollertypetensioner.
5 Start-Up
Atthispointitisassumedthattheinstallationiscomplete
andthattherecommendationsandinstructionshavebeen
followed.Thefollowingwilloutlinetheproperproceduresfor
startingandadjustingthedehumidier.
5.1 Manual Operation
Ifthedehumidieristoberuncontinuously,withouttheuse
oftheinstalledautomatichumidistat,placethe“HAND/OFF/
AUTO”switchintothe“HAND”position.Theunitwillenergize,
asindicatedbythegreen“UNITRUN”light,andcommence
dehumidication.
5.2 Automatic Operation
Ifthedehumidieristobeoperatedbytheinstalled
humidistat,adjustthehumidistattothedesiredsetpoint,and
placethe“HAND/OFF/AUTO”switchintothe“AUTO”position.
Providedthatsensedrelativehumidityrequiresdehumidier
operation,theunitwillenergize,asindicatedbythegreen
“UNITRUN”light,andcommencedehumidication.