EasyManua.ls Logo

Piper ARCHER III - Cold Weather Operation

Piper ARCHER III
422 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 8
HANDLING, SERV & MAINT PA-28-181, ARCHER III
REPORT: VB-1611 ISSUED: JULY 12, 1995
8-20 REVISED: JANUARY 29, 2007
(f) Cleaning Carpets
To clean carpets, first remove loose dirt with a whisk broom or
vacuum. For soiled spots and stubborn stains use a non-flammable dry
cleaning fluid. Floor carpets may be removed and cleaned like any
household carpet.
8.29 COLD WEATHER OPERATION
For cold weather operation a winterization plate is installed on the inlet
opening of the oil cooler duct on the left rear engine baffle. This plate should
be installed whenever the ambient temperature reaches 50°F or less. The
plate should be removed and stored in the cockpit when the ambient
temperature exceeds 50°F.
It is recommended that an optional Engine Breather Tube Winterization
Kit be installed for cold weather operation. This kit is available through your
Piper Dealer/Distributor.
SECTION 8
HANDLING, SERV & MAINT PA-28-181, ARCHER III
REPORT: VB-1611 ISSUED: JULY 12, 1995
8-20 REVISED: JANUARY 29, 2007
(f) Cleaning Carpets
To clean carpets, first remove loose dirt with a whisk broom or
vacuum. For soiled spots and stubborn stains use a non-flammable dry
cleaning fluid. Floor carpets may be removed and cleaned like any
household carpet.
8.29 COLD WEATHER OPERATION
For cold weather operation a winterization plate is installed on the inlet
opening of the oil cooler duct on the left rear engine baffle. This plate should
be installed whenever the ambient temperature reaches 50°F or less. The
plate should be removed and stored in the cockpit when the ambient
temperature exceeds 50°F.
It is recommended that an optional Engine Breather Tube Winterization
Kit be installed for cold weather operation. This kit is available through your
Piper Dealer/Distributor.

Table of Contents