\
SUPPLEMENT 1
AIR CONDITIONING INSTALLATION
This supplement must be attached to the Pilot's Operating Handbook
and FAA Approved Airplane Flight Manual when the optional air
conditioning system is installed in accordance with Piper Drawing 99575-10.
The information contained herein supplements or supersedes the Pilot's
Operating Handbook and FAA Approved Airplane Flight Manual only in
those areas listed herein. For limitations, procedures and performance
information not contained in this supplement, consult the Pilot's Operating
Handbook and FAA Approved Airplane Flight Manual.
This supplement has been ``FAA Approved’’ as a permanent part of this
handbook and must remain in this handbook at all times when the optional air
conditioning system is installed.
FAA APPROVED:
PETER E. PECK
D.O.A. NO. SO-1
THE NEW PIPER AIRCRAFT, INC.
VERO BEACH, FLORIDA
DATE OF APPROVAL: JUL
Y 12, 1995
\
SUPPLEMENT 1
AIR CONDITIONING INSTALLATION
This supplement must be attached to the Pilot's Operating Handbook
and FAA Approved Airplane Flight Manual when the optional air
conditioning system is installed in accordance with Piper Drawing 99575-10.
The information contained herein supplements or supersedes the Pilot's
Operating Handbook and FAA Approved Airplane Flight Manual only in
those areas listed herein. For limitations, procedures and performance
information not contained in this supplement, consult the Pilot's Operating
Handbook and FAA Approved Airplane Flight Manual.
This supplement has been ``FAA Approved’’ as a permanent part of this
handbook and must remain in this handbook at all times when the optional air
conditioning system is installed.
FAA APPROVED:
PETER E. PECK
D.O.A. NO. SO-1
THE NEW PIPER AIRCRAFT, INC.
VERO BEACH, FLORIDA
DATE OF APPROVAL: JUL
Y 12, 1995
SECTION 9
PA-28-181, ARCHER III SUPPLEMENT 1
SECTION 9
PA-28-181, ARCHER III SUPPLEMENT 1
ISSUED: JULY 12, 1995 REPORT: VB-1611
9-3
ISSUED: JULY 12, 1995 REPORT: VB-1611
9-3