EasyManuals Logo

Planet WGs-4215-8HP2S User Manual

Planet WGs-4215-8HP2S
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
6
3.2 Wall Hanging Installation
To hang the Wall-mount Managed Switch on the wall, simply follow the following
steps:
Step 1: Drill 2 holes (one hole on each side) with 8mm diameter on the wall; the
distance between the 2 holes is 230 mm and the line through them must
be horizontal.
1 2
Step 2: Place two anchors inside the hole by hammering them. Then screw the
two screws leaving a space of 2mm apart as shown in the circled diagram
below.
ACTLNK
ACTLNK
1G/2.5G
100
1000 LNK/ACT
10/100 LNK/ACT
bt PoE-in-Use
at PoE-in-Use
R.O.
Ring
PWR 2
PWR 1
SFP
9
10
PWR 1
V1
V1+
PWR 2
V2
V2+
3 421 7 865
WGS-5225-8UP2SV
Managed
Fiber
SFP
9
10
Alarm
Smart L CD
DC Input Range
48-54V
, 8A max.
PoE++
Dual power input is required
for maximum PoE loading.
Max. Fault Alarm Loading: 24V, 1A
1000 LNK/ACT
10/100 LNK/ACT
bt PoE-in-Use
at PoE-in-Use
3 421
PoE++
1000 LNK/ACT
10/100 LNK/ACT
7 865
PoE+
V+
Ground
SFP
9
10
ACTLNK
ACTLNK
1000
100
120W
240W
360W
PWR
SFP
9
10
PoE Usage
DC Input Range
48-54V
, 8A max.
WGS-4215-8HP2S
Managed
Fiber
PoE
++
at PoE-in-Use
2mm
4mm Screw

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Planet WGs-4215-8HP2S and is the answer not in the manual?

Planet WGs-4215-8HP2S Specifications

General IconGeneral
BrandPlanet
ModelWGs-4215-8HP2S
CategorySwitch
LanguageEnglish

Related product manuals