YYou receive the system cabinou receive the system cabinet PSVet PSV-Z-035 ready asse-Z-035 ready assembled. The positionmbled. The positions ofs of
the individual system components in the cabinet is shown inthe individual system components in the cabinet is shown infi
figurguree 3.13.155..
1.1. Undo tUndo the houshe housing feet oing feet of the sysf the system cotem componmponents aents and keep thnd keep the house housinging
feet and the screws in a safe place.feet and the screws in a safe place.
2.2. PlacPlace the cone the controlltroller at the boter at the bottom as thtom as the air vente air vents are sits are situateuated in thed in the
bottom plate.bottom plate.
3.3. InseInsert thrt the wore workstkstatioation abovn above the e the contcontrollerollerr..
4.4. Are tAre the air vehe air vents of nts of your jyour junctunction boion box in the tx in the top plaop platete ? If not? If not, pleas, pleasee
exchange the top and bottom plate.exchange the top and bottom plate.
5.5. InseInsert thrt the junce junction tion box abox above bove the wthe worksorkstattation.ion.
6.6. Fix Fix all fall front ront panepanels wls with tith the sche screws rews proviprovided.ded.
7.7. PlacPlace the e the other other systsystem coem componmponentents as s as showshown inn infi
figurguree 3.13.155..
To ensure sufficient cooling, the controller must be situated at the bottom and the junctionTo ensure sufficient cooling, the controller must be situated at the bottom and the junction
box at the top of the system cabinet!box at the top of the system cabinet!
Figure 3.15: Position of the PSV components on the system cabinetFigure 3.15: Position of the PSV components on the system cabinet