6B-4
1968
PONTIAC
SERVICE
MANUAL
Fig.
6B-5
Accelerator
Linkage
—Pontiac
ADJUSTMENTS
ON CAI
All
Rochester
BV adjustments can be performed
on
the car.
With
the exception of the
idle
speed
and
mixture
adjustment, all adjustments are included In
the Overhaul and Adjustments procedure.
IDLE
SPEED
AND
MIXTURE ADJUSTMENT
With
the engine at operating temperature, adjust
idle
speed
following
the procedure at the end of
section
6D.
OVERHAUL
AND
ADJUSTMENT
DISASSEMBLY
OF
CHOKE
1. Disconnect choke vacuum break
hose
at dia-
phragm
unit
and
from
pipe in
throttle
body.
2.
Remove choke shaft lever screw (diaphragm
side).
Remove two diaphragm bracket
screws
and
remove vacuum break diaphragm assembly.
3. Remove fast
Idle
cam attaching screw. Then
fast
Idle
cam and choke rod can be removed
from
upper choke lever by
carefully
rotating
assembly
upward
and
sliding
end of rod out of upper choke
lever.
The choke rod can now be removed
from
fast
Idle
cam by
rotating
cam over end of rod.
4.
To remove choke valve, remove
stake
on end of
choke valve screws. Then remove two choke valve
attaching
screws
from
choke shaft and
pull
upward
on
choke valve to remove
from
shaft. Choke shaft
and
lever assembly can now be removed
from
air
horn.
Note
position
of choke
trip
lever in
relation
to
upper choke lever tang for
ease
in reassembly.
DISASSEMBLY
OF AIR
HORN
1.
Remove
fuel
filter
inlet
nut and
gasket
with
1"
wrench.
Then remove
filter,
filter
spring and
gasket
between
filter
element and back side of
inlet
nut.
NOTE:
Large
open
end of
filter
element
always
faces
fuel
inlet
nut.