FOUR
SPEED
SAGINAW
MANUAL
TRANSMISSION
7C-7
2.
Install
a blocking
ring
with
clutching teeth
downward
over synchronizing surface of the
third
speed
gear.
NOTE:
All 4 blocking rings in the transmission
are
the same and interchangeable.
8.
Install
1st and 2nd synchronizer
snap
ring
(Fig.
7C-4).
9.
Install
blocker
ring
with
notches
downward so
they
align
with
keys of 1st and 2nd synchronizer
assemblies.
3.
Install
3rd and 4th synchronizer
assemblies
with
the
fork
slot downward, pressing it onto splines
on
the mainshaft
until
it bottoms out (Fig. 7C-13).
CAUTION:
Be sure the notches of the blocker
ring
align with the keys of the synchronizer
assembly.
10.
Install
first
gear
with
clutching teeth
downward.
11.
Install
first
gear
thrust
washer
(steel) and
spring
washer.
12.
With
snap
ring
slot downward,
press
rear
bearing onto mainshaft (Fig.
7C-15).
4.
Install
3rd and 4th synchronizer
snap
ring.
Both
synchronizer
snap
rings are the
same.
5.
Turn
the
rear
of the mainshaft upward and in-
stall
second
speed
gear
with
clutching teeth upward;
front
of
gear
will
butt against flange on mainshaft.
6.
Install
blocker
ring
with
clutching teeth down-
ward
over synchronizing surface of second
gear.
7.
With
fork
slot downward,
press
1st and 2nd
synchronizer
assemblies
onto splines of mainshaft
(Fig.
7C-14).
CAUTION:
Be sure notches of blocker
ring
align
with
keys of synchronizer assembly.
FORWARD
END OF
MAINSHAFT
mm
1ST.-2ND.
SYNCH
RONIZER
SPLIT
RING
1ST
GEAR
v
REAR
BEARING
FORWARD
END
OF
MAIN
SHAFT
SPLIT
RING
Fig.
7C-15
Installing
Rear
Bearing
13.
Install
rear
bearing
snap
ring
(Fig.
7C-4).
14.
Place
speedometer
gear
retainer in output
shaft.
15.
Align
slot in
speedometer
drive
gear
with
re-
tainer
clip
and slide
gear
into place.
Fig.
7C-14
Installing
1st and 2nd
Synchronizer
and
Second
Gear
COUNTER
GEAR-ASSEMBLE
Refer to Section 7B.