EasyManua.ls Logo

Power Apex - Aftercare and Maintenance; Shed Preservative and Re-treatment

Power Apex
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Finishing touches
1. Using the 40mm galvanised nails, fit the bargeboards to the roof panels and secure the diamond finials over
the top of the bargeboards.
2. Secure corner strips at each corner of your Power shed with 40mm nails (at least four per strip).
Extra strips are provided to cover any joins between side wall panels.
Note the cover strips for the gable ends will come in two pieces.
Ensure the full piece is at the top (this will tie in the gable top to the panel beneath) and then the strip
underneath will need to be cut down to fit.
3. Secure the door pull to the door with 25mm screws.
4. Ensure there are no overhanging branches or debris on the shed as this can lead to water ingress.
Please be aware, this will need to be checked regularly as part of the maintenance of the shed.
5. Peel the protective blue sticker off the Power branding plate above the door.
PAGE 22 OF 26

Other manuals for Power Apex

Related product manuals