EasyManua.ls Logo

Power Apex - Truss Assembly

Power Apex
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Gable Tops
1. The 8ft gable tops will come in two halves.
These need to be joined together with three 50mm screws as follows:
2. Line up the gable tops with the panels at the gable ends (the ends where you attached the ‘heavy duty
bearers’).
3. Secure them to the wall panels with 50mm screws from the inside, screwing upwards through the framing.
4. Complete this at each end of the shed.
PAGE 18 OF 26

Other manuals for Power Apex

Related product manuals