Power Two-Tiered Staging Unit Installation Instructions
Power Shed Staging Units come at either 2ft or 4ft long.
You will receive the following components in each individual staging pack:
• (2x) Shelving Panels (either 2ft or 4ft)
• (2x) Legs (for the front of the panels only)
Please note:
• Depending on where you decide to install the staging units – you may need to cut the panels down. Before
attaching the panels to the framing ensure they are correctly sized.
• Use 70mm screws from the fixing pack to attach the shelving panels to the framing.
• When screwing the shelving into position, ensure they are fixed to the internal framing of the shed and not the
cladding
1. The staging units are designed to fit our Power Potting Shed window panels (however can be attached to any
shed in our range), being fixed against the internal framing of the shed with the 70mm screws.
2. Use a spirit level to ensure they are level. We would recommend to pre-drill the holes for the screws to
ensure the timber does not split.
3. Fix the legs to the shelves, once again using the 70mm screws.
After these are added continue adding each additional staging unit (if necessary) securing batons as you go.