Installation checklist
Done
Task
Step 1: Planning

Identify the location where the PF-JT48 EV charger will be installed at the site

Unbox the PF-JT48 and verify everything is included

Gather all the required tools before going onsite for the installation
Step 2: Installation

Install the PF-JT48 securely to a wall or pedestal

Attach power, communications, and ground bond cables to the enclosure

Ensure all external connections are properly sealed and junction box (and any wires) are
not exposed

Install the charging connector holster (one of two types available from PowerFlex for
cable management)

Install a cable retractor or a high-point anchor (cable management)
Step 3 and 4: Inspection and Validation (usually performed later)

Gather information from the site using the app

Submit site information to PowerFlex with FFF

Get OK to energize and finalize the installation from PowerFlex support

Energize power to the PF-JT48
