Copyright © 2022-2023 PowerFlex Systems, Inc. All Rights Reserved. 2
How to use this guide
To complete the installation of a PF-JT48 EV charger to a wall or pedestal, there are four steps:
1. Planning: Inspect the PF-JT48 box contents and gather the tools necessary to install the EV charger.
2. Installation: Mount the PF-JT48’s enclosure and connect wiring as required at your site.
3. Inspection: Record site information and start the commissioning process.
4. Validation: Energize the PF-JT48 and confirm that everything is up and running.
Although these steps appear to be a sequence of steps, some activities may be performed in parallel (or
in a slightly different order). To further assist in PF-JT48 installation, refer to the following information in
this guide:
▪ Checklist of things to do during the installation
▪ Technical specifications
Other guides that will help with site installation:
▪ Nexus Core Installation Guide — includes download and instructions for how to use the FastField
Forms (FFF) app and how to energize and commission the PowerFlex system.