EasyManua.ls Logo

PowerFlex PF-JT48 - How to Use this Guide

Default Icon
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Copyright © 2022-2023 PowerFlex Systems, Inc. All Rights Reserved. 2
How to use this guide
To complete the installation of a PF-JT48 EV charger to a wall or pedestal, there are four steps:
1. Planning: Inspect the PF-JT48 box contents and gather the tools necessary to install the EV charger.
2. Installation: Mount the PF-JT48’s enclosure and connect wiring as required at your site.
3. Inspection: Record site information and start the commissioning process.
4. Validation: Energize the PF-JT48 and confirm that everything is up and running.
Although these steps appear to be a sequence of steps, some activities may be performed in parallel (or
in a slightly different order). To further assist in PF-JT48 installation, refer to the following information in
this guide:
Checklist of things to do during the installation
Technical specifications
Other guides that will help with site installation:
Nexus Core Installation Guide includes download and instructions for how to use the FastField
Forms (FFF) app and how to energize and commission the PowerFlex system.