Manual#: 851-000134
Version 3.4 – 08/11/2022
Powerside recommends charging your UPS1 modules every 6 months while they are in storage
(charging range: -0 to +40° C). You must store your UPS1 modules at an ambient temperature
between -20 to 60° C.
4.5 Cleaning Instructions
If necessary, wipe the accessible parts of your PQube 3 with a slightly damp cloth while it is powered
off. Do not use abrasives or chemical cleaners and do not clean your PQube 3 while it is powered on.
4.6 Reasons for Reset
If your PQube 3 is configured to email you whenever system activity occurs, it will notify you
whenever it has reset.
One of the processes of the PQube 3 is stuck or taking too much time
to complete compared to expected time.
A new Setup.ini file has been sent.
A firmware update was sent and PQube 3 restarted.
User Triggered Display Reboot
The touchscreen <Action> <reboot> has been used.
A reset has been requested from the web command page.
Battery Timeout Reached.
Battery Percentage: XX%
The PQube 3 has shut down after reaching the configured autonomy
of battery (see PQube 3 configuration).
No reason identified (default).
4.7 Calibration Information for Your PQube 3
Every PQube 3 is calibrated and traced to NIST at the factory. You can download a free NIST trace
certificate that contains the specific calibration information for your PQube 3 by entering your
PQube 3’s serial number at https://www.powerside.com/certificates.