Section Three - Preventive Maintenance
Preventive maintenance measures are either scheduled or unscheduled. Scheduled preventive
maintenance activities are included here so that you are aware of the preventive measures to be
performed on a regular basis.
Regular Preventive Maintenance (Owner)
Cleanliness of the EFX and its operating environment will keep maintenance problems and
service calls to a minimum. Precor recommends that you perform the following preventive
maintenance schedule.
At the End of Each Day
Wipe down the stairarms, ramps, wheels and frame with a damp cloth.
Every Week
Wipe the surface of the electronic console with a slightly-damp sponge or soft cloth. Dry with a
clean towel.
CAUTION
Keep water away from electronic components to prevent shock.
On-Site Preventive Maintenance (Service Technician)
Perform the following preventive maintenance tasks each time you are called to service a EFX:
Examine the belts for wear, cracks or other signs of deterioration and replace if necessary.
Check the LED’s mounted on the upper PCA and the function keys displayed on the electronic
console by performing Procedure 2.1.
Visually examine all wires and check connectors and wire connections. Secure connections and
replace wiring as necessary.
Check unit operation per Section Four.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Precor 5.25 and is the answer not in the manual?

Precor 5.25 Specifications

General IconGeneral
BrandPrecor
Model5.25
CategoryElliptical Trainer
LanguageEnglish

Related product manuals