EasyManua.ls Logo

Prepac BT-4100-2K - Step 9: Attach Upper Stabilizer

Prepac BT-4100-2K
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 9 of 20
Side Panel
Finished
edge
STEP 7
Estimated Time: 5 minutes
Using JCB connectors, and the Allen Key provided, attach the
side panel (B3) to both inner gables.
The finished edge should be facing up.
If you have any difficulty tightening the JCB connector,
use a screwdriver to adjust the JRN nut to make sure
the hole is facing the opening for the connector
JCB
Connector
JRN
Nut
B3

Related product manuals