DIAMOND19
8
- 2 - INSTALLATION
2.1 MOUNTING
The DIAMOND19 may be set up on a solid and even surface. By means of the xing facilities of the base-
plate, the unit can also be mounted upside down to a cross arm. The base plate is shown in g.3. For xing,
stable mounting clips are required. According to the gure, the bolts of the brackets are placed into the
openings provided in the base plate and turned clockwise until they lock (to the stop). Always ensure that
the unit is rmly xed to avoid vibration and slipping while operating. The mounting place must be of
sucient stability and be able to support a weight of 10 times of the unit’s weight. When carrying out any
installation, always comply scrupulously with all the regulations (particularly regarding safety) currently
in force in the country in which the xture’s being used. Always additionally secure the projector with the
safety rope from falling down. For this purpose, fasten the safety rope at a suitable position so that the
maximum fall of the projector will be 20 cm.
Fig.3
CLAMP
SAFETY
CABLE
OMEGA
BRACKETS