EasyManua.ls Logo

ProMinent delta DLTa - Page 76

ProMinent delta DLTa
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P_BE_0012_SW
Fig. 31: The leakage hole
Interval Maintenance work Personnel
Quarterly* In addition:
n Check that the return line is fixed firmly to the liquid end.
n Check that the bleed valve is tight.
n Check the discharge and return line for kinks.
n Check that the bleed valve is operating correctly.
Technical personnel
* Under normal loading (approx. 30% of continuous operation).
Under heavy loading (e.g. continuous operation): Shorter intervals.
Data Value Unit
Tightening torque for screws: 4.5 ... 5.0 Nm
Liquid ends with bleed valve:
Tightening torque
Maintenance
76

Table of Contents