EasyManua.ls Logo

Proto Rize - Page 11

Proto Rize
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LOA DERS A ND F EE D NEC K
LOADERS AND FEED NECK
To achieve the maximum
performance of the RIZE you will
need to use a mo toriz ed load er that
force feed s p aintballs into the
RIZE marker, p referab ly the
Rotor Load er. Using a slower
mo toriz ed load er or a no n-
mo toriz ed load er will work, b ut the
rate of fire and p erformance will be
red uced.
TO F IT A LOADER ONTO THE
RIZE :
1. To fit a load er o nto the RIZE,
tighten your load er int
o the
adjustable feed neck using a 5/ 32
A llen key.
2. Load er should now b e held in with a snug fit.
3. There is no maintenance need ed for the feed neck
besides keep ing it clean of b ro ken p aint, d irt and
deb ris.
AIR/ NITRO GEN
AIR / NITROGEN TANK OPTIONS AND INSTALLATION
The RIZE with Comp ressed air and Nitro gen air systems
such as the DY E Throttle® air system and will also
work with CO
2
. Do not use any other comp ressed
gas. The o utp ut pressure fro m the air system has
to b e b etween 4 0 0 850 p si. If you are using CO
2
it is essential that the tank is fitted with an anti-
siphon tub e to p revent liq uid CO
2
from
entering the RIZE.
To install an air system, screw the tank into
the airp ort all the way as far as it will g o.
To remove the air system screw out.
There will b e g as leaking for a few
second s while you screw the
air system
out. Notice that even with the air
system removed there can b e g as
insid e the RIZE and it can still fire
a p aintball. A lways treat the
marker as being live and never
po int it to any thing you d on’t
intend to sho ot at!
18
19
W W W . D Y E P A I N T B A L L . C O M W W W . D Y E P A I N T B A L L . C O M

Related product manuals