EasyManua.ls Logo

PSG PSG-2000 - 4- Appliance Start-Up; 5- Prolonged Closing

PSG PSG-2000
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
37
4- APPLIANCE START-UP
The start-up must be performed by a qualified technician. Make sure the installation is completed and the
oil tank has been filled up. The oil line must also have been purged.
5- PROLONGED CLOSING
A) Cut off the electric circuit
B) Close the oil shut-off valve
NOTE: The shut-off valve must be closed when the appliance is out of service for a prolonged period of
time.
6- MAINTENANCE
At the beginning of heating season, have the complete installation inspected by a qualified service man,
especially the lighting system and the controls.
SERVICE:
Before calling for service, first check the following:
- Fuel supply
- Electric fuses or breakers
- Thermostat setting
- Fan limit controls settings
- The state of the green diagnostic LED on the burner control (see section: 3. APPLIANCE
INSTALLATION, COMBUSTION SAFETY CONTROL).
CAUTION: CLOSE THE BLOWER COMPARTMENT ACCESS
PANEL BEFORE STARTING THE BURNER.
NOTE: THE UNIT’S MAINTENANCE, REPAIRS AND THE CLEANING OF
THE OIL FILTER MUST BE DONE BY A QUALIFIED TECHNICIAN.

Related product manuals