EasyManua.ls Logo

PT W1650 - Packaging Contents; Setup Instructions

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
4
5
6
7
10 12 13
8
9
14 15
16
11
PACKAGING CONTENTS
1 Pump .................................. 1
2 Spreader Wedge ................. 1
3 Ram..................................... 1
4 Case .................................... 1
5 3-3/4 in. Extension .............. 1
6 5 in. Extension .................... 1
7 8-1/2 in. Extension .............. 1
8 16-1/2 in. Extension ............ 1
9 Flat Base ............................ 1
10 Ram Toe ............................. 1
11 Plunger Toe ........................ 1
12 Wedge Head ...................... 1
13 V-base ................................ 1
14 Male Connector ................. 1
15 Cap Head ........................... 1
16 Rubber Head...................... 1
No. Description Qty. No. Description Qty.
RAM ATTACHMENTS:
1.
The Extensions (5-8) connect in different combinations to reach desired lengths.
2. The Male Connector (14) is used to connect the female end of the Ram (3) to a
base (9 or 13).
3. The Flat Base (9) is typically used on the stationary side to spread out the
force of the Ram (3).
4. The V-Base (13) is used to offset the force of the Ram (3) when there is not a
straight line between the stationary side and the damaged side, or to spread
out force on curved surfaces.
5. The Cap Head (15) is typically used on the pushing end to prevent slipping.
6. The Rubber Head (16) is typically used for popping dents out of sheet metal
such as doors or body panels and to minimize damage to the work surface.
7. The Wedge Head (12) is used to repair small dents and areas located in
angles and tight spaces.
SETUP INSTRUCTIONS

Related product manuals