Appendix
49
The following pages contain several forms that may be useful for the site. We recommend
that the Equipment Location and Site Closeout Checklist forms be used for most sites.
These forms may be copied.
List of Forms
Equipment Location This form, along with a wiring map of the site, should be kept
on-site with this manual. The dealer should also retain a copy in
their customer les.
Site Closeout
Checklist
This form is a tool to protect both the end user and the dealer.
The dealer and an authorized representative of the site should
walk the property while reviewing the checklist to verify that all
items are installed correctly and working properly. Both parties
should sign off on the checklist and keep a copy. This list may
not be comprehensive to all of the work that the installer may
have performed on the site, therefore, be sure to check all work.
Service History This form should be completed at installation and updated any
time service is performed on the system. This includes regular
maintenance, troubleshooting, repairs, and future additions or
upgrades.
Dealer/Service
Contact Information
This form should be lled out by the dealer/installer at the
completion of the project. This will tell the client who to call for
service, maintenance, or future additions.