EasyManuals Logo

Quick MILL E61 Series User Manual

Quick MILL E61 Series
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
13
Ita
lia
no
En
gli
sh
Fr
an
ça
is
D
eu
tsc
h
Commissioning
1. Remove the tank filler lid (m).
2. Fill the tank (n), under the cup warmer, with drinking water, softened if
possible.
3. Connect the machine to an electric socket, switch on the machine with the
general switch (o) on position 1, the green ON light switches on.
4. The machine fills the boiler.
5. Start the delivery of the coffee brew group through the lever (b), turn on the
water from the group to make sure that the circuit has filled correctly.
6. Wait for the machine to reach the working temperature, indicated by the
orange light that switches off (p) and the pointer of the boiler gauge
(h) that is to indicate a value between 1 Bar and 1,5 Bar. When the
machine has reached the working temperature also the green light (q)
switches on, indicating that the machine is ready.
Coffee brew
1. Remove the filter holder (c) from its seat, turning it clockwise.
2. Fill the filter with one or two doses of coffee (according to the filter
inserted).
3. Press the coffee with the presser.
4. Place the filter holder (c) to its seat, turning it anti-clockwise.
5. Place the cups under the corresponding outlets under the filter holder.
6. Lift the coffee delivery lever (b) to the horizontal position to start the coffee
brew, and after a few seconds the coffee brew starts.
When the desired amount of coffee has been delivered, lower the group
lever to the vertical position.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quick MILL E61 Series and is the answer not in the manual?

Quick MILL E61 Series Specifications

General IconGeneral
BrandQuick MILL
ModelE61 Series
CategoryCoffee Maker
LanguageEnglish

Related product manuals