EasyManuals Logo

Quingo Flyte User Manual

Quingo Flyte
78 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
38
Step 2- Slide out the docking
station ramps.
a) Fully lift your tailgate.
The Docking Station will
be fully assembled and
secured in position by
your engineer, you
should still carry out a
few safety checks
yourself on a daily basis
to ensure the Docking
Station is still secure.
b) Release the locking
latch and at the same
time, slowly pull the
ramps approximately
5cm or 2 inches away
from the docking
station.
c) Now grip both the left
and right green ramp
handles and fully
extend the ramps. Two
sets of OK labels will be
displayed when fully
extended. Lower the
ramps to the floor- you
can use the assisting
cane to avoid bending
(see page 39).
ALWAYS use both hands to hold the green handles when sliding the ramp
sections in and out.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quingo Flyte and is the answer not in the manual?

Quingo Flyte Specifications

General IconGeneral
FoldableYes
Weight Capacity220 lbs
BatteryLithium-ion
Max Load158 kg
Charging Time4-5 hours